Details of the agreement
The following Project Activities that the parties consent to are:
- Exploration and Production Related Project Activities:
(a) the exploration, extraction, collection, processing or production of, natural gas;
(b) the extraction, collection, processing or production of water derived from the process of
extracting natural gas;
(c) agricultural activities which use water of the kind referred to in paragraph (b);
(d) anything permitting or requiring any of the things referred to in paragraphs (a), (b) and (c).
- Gas Transmission Related Project Activities:
(a) the collection, distribution, transmission or transportation of natural gas;
(b) the collection, distribution, transmission or transportation of water derived from the process of extracting natural gas;
(c) any Looping Project;
(d) anything permitting or requiring any of the things referred to in paragraphs (a), (b) and (c).
- LNG Related Project Activities:
(a) the planning, design, development, construction, operation and any maintenance of an LNG processing plant or plants and any facilities related to, or which are necessary or desirable for, such plant or plants;
(b) the planning, design, development, construction, operation and maintenance of wharves, jetties, loading facilities, terminals, berths, pipelines, construction docks, material off loading facilities, accommodation facilities, storage facilities, depots and transport facilities;
(c) the planning, design, development, construction, operation and maintenance of any type of facilities for the loading of LNG onto ships;
(d) anything permitting, requiring or facilitating any of the things referred to in paragraphs (a), (b) and (c).
The above mentioned activities however do not include changes to any tenements, petroleum tenures,licences, permissions and authorities, involving land tenures or other interests in land, statutory, regulatory or other approvals and any physical activities.
For purposes of this Agreement, the words planning, preparation, exploration, extraction
production, collection, transmission distribution, conversion, storage, export and transportation have their widest possible meaning.
Commencement
This ILUA commences on the 22 May 2012 and may be terminated at any time by agreement in writing between Arrow Energy, the Native Title Party and the State.
If by the means of a tenure grant/requirement of the state, Arrow Energy is required to surrender any area, then it has a period of at least 3 months to consult with native title party or corporate entity about the location and extent of the surrender area. The surrender area should not exceed 70 hectares in aggregate.
Native Title Provisions
Future Acts: As per this agreement all future acts shall be validated as at the registration date (24/04/2013).
Right to Negotiate: The right to negotiate does not apply to any project activities as covered by the agreement.
Native Title in the ILUA Area
The Port Curtis Coral Coast Claim application for native title was filed on 25 July 2001 by the Port Curtis Coral Coast People. | |