Coober Pedy Renewable Hybrid Project Indigenous Land Use Agreement (ILUA) | ||
Date: | 8 September 2015 | |
Sub Category: | Indigenous Land Use Agreement (ILUA) (Native Title Act) | |
Place: | Located south-east of Coober Pedy | |
Click this link to search this location with google maps | ||
State/Country: | South Australia, Australia | |
Click this link to search this location with google maps | ||
The area covered by this agreement includes approximately 36 hectares south-east of Coober Pedy. This area is described and depicted in Schedule 1, Parts 1 and 2 as the Solar Array Area, the Wind Turbine Area, the Wind Turbine access area, the Powerline Route area, and the Powerline Access area shown on a map. Both of these documents are attached below. The area is within the jurisdiction of the Coober Pedy District Council. | ||
Legal Status: | Registered on the Register of Indigenous Land Use Agreements on 9 September 2015. This is an authorised body corporate agreement under the Native Title Act 1993 (Cth). | |
Legal Reference: | National Native Title Tribunal file no.: SI2015/004 | |
Subject Matter: | Future Act | Land Use | Native Title | |
URL: | http://www.nntt.gov.au/searchRegApps/NativeTitleRegisters/Pages/ILUA_details.aspx?NNTT_Fileno=SI2015/004 | |
Summary Information: | ||
The Coober Pedy Renewable Hybrid Project Indigenous Land Use Agreement (ILUA) was agreed, under the provisions of the Native Title Act 1993 (Cth) (the NTA), between:
The ILUA provides consent for EnGen's acquisition of land interests, obtaining of grants, and the undertaking of operations in relation to the Coober Pedy Renewable Hybrid Project. The Native Title Representative Body for this area is the South Australian Native Title Services Ltd. | ||
Detailed Information: | ||
Background to the Agreement Energy Generation Pty Limited is a subsidiary of Energy Developments Pty Limited (EDL). The Coober Pedy Renewable Hybrid Project is owned and operated by EnGen (Energy Developments Pty Ltd). The agreement covers the Wind Turbine Area, the Powerline Area, and the Solar Array Area. For more detail of these areas, see the Extract and Schedules attached. Commencement and Termination The Indigenous Land Use Agreement is binding from the date signed by all the parties and will start on the Commencement Date. The agreement will continue until:
However, the Commencement Date and Termination Date are not specified within the Extract from the Register of Indigenous Land Use Agreements.
To the extent that these are Future Acts in the ILUA area, the parties agree that the right to negotiate provisions of the NTA under Subdivision P, Division 3, Part 2 of the Act do not apply to the agreed future acts. Extinguishment The parties agree that the non-extinguishment principle applies. This means that under s 24EB(3) of the NTA, any of the activities authorised under this ILUA which may be inconsistent with native title rights and interests do not extinguish these rights and interests. Instead, they are revived when the activities are finished. Future act provisions The parties agree to:
Project refers to the Coober Pedy Renewable Hybrid Project, which includes the Solar Array, the Wind Turbines, the Powerline and the Generation Plant.
Wind Turbines are to be used as wind generators, used for converting wind to electrical energy and will also be constructed and operated as part of the Project. Powerline means the powerline from the Solar Array and the Wind Turbines to the Generation Plan to be constructed and operated as part of the Project. The location of each of these aspects of the project is included in the map located below.
|
| ||||
| ||||
|