Future Act Agreement (Native Title Act)
An agreement made under the future act provisions of the Native Title Act 1993 (Cth) about a "future act" - a proposed activity or development that may affect native title - which requires an agreement with the native title parties in order for the activity to be valid.


A Note on Future Acts and the ATNS Database
Procedures for the negotiation of Future Act Agreements are contained in section 31 of the Native Title Act 1993 (Cth). As such, these agreements are often referred to as Section 31 Agreements. Once agreement is reached, the negotiating parties are required to lodge a copy of the agreement with the NNTT. However, in a majority of cases, parties will provide an agreement that will satisfy the specifications of the NTA but, for reasons of confidentiality, gives very few details of the contents of that agreement or its subject matter. For example, payment details will rarely be included. The NNTT does not have access to the particulars of these agreements. Basic facts (such as name and date) of the agreements are therefore published on the NNTT website, however, no further detail is available. Accordingly, unless a particular agreement is made public by the parties, agreements reached through this process are not included in the ATNS database. For more information click here


On information currently available, as at April 2012 some 2,663 Section 31 Agreements had been lodged with the NNTT. Only a handful of those - those made public by the negotiating parties - are detailed below.
NameDateDocuments
Chalumbin Wind Farm Area Indigenous Land Use Agreement4/11/2022 
Upper Burdekin Wind Farm Indigenous Land Use Agreement27/06/2022 
Snake Hill Indigenous Land Use Agreement (ILUA)5/07/2021 
Brickhouse and Yinggarda Aboriginal Corporation Indigenous Land Use Agreement (ILUA)31/05/2021 
Brickhouse and Nganhurra Thanardi Garrbu Aboriginal Corporation Indigenous Land Use Agreement31/05/2021 
Kneebone Community Living Area Indigenous Land Use Agreement (ILUA)26/05/2021 
Pardoo Beef Corporation Irrigated Agriculture Project Indigenous Land Use Agreement (ILUA) (Body Corporate) 20207/05/2021 
Barada Barna and Bowen Basin Coal Indigenous Land Use Agreement (ILUA)27/04/2021 
East Point Mackay Project Supplementary24/03/2021 
Tiwi Pontoon Project Indigenous Land Use Agreement (ILUA)26/02/2021 
Mirning People Part B Indigenous Land Use Agreement (ILUA)14/12/2020 
Greenvale Training Area Gugu Badhun Indigenous Land Use Agreement (ILUA)9/12/2020 
Greenvale Training Area Ewamian Inidgenous Land Use Agreement (ILUA)4/12/2020 
Greenvale Training Area Gudjala Indigenous Land Use Agreement (ILUA)25/11/2020 
Specimen Hill Wind Farm Project Indigenous Land Use Agreement (ILUA)6/11/2020 
Ningaloo Conservation Estate Indigenous Land Use Agreement (ILUA)1/10/2020 
St Ives Pistol Club and Awabakal and Guringai People and Ors Indigenous Land Use Agreement (ILUA)15/09/2020 
Port Spencer Indigenous Land Use Agreement (ILUA)10/09/2020 
Barada Barna and Lotus Creek Wind Farm Indigenous Land Use Agreement (ILUA)25/08/2020 
Yamatji Nation Indigenous Land Use Agreement (ILUA)30/07/2020 
Dingo Gas Production Indigenous Land Use Agreement (ILUA)16/07/2020 
Gkuthaarn and Kukatj People Tenure Resolution Indigenous Land Use Agreement (ILUA)2/07/2020 
Vitrinite and Barada Barna Indigenous Land Use Agreement (ILUA)23/06/2020 
Wanna and Combined Thiin-Mah, Warriyangka, Tharrkari, Jiwarli Indigenous Land Use Agreement (ILUA)15/06/2020 
Glen Florrie and Combined Thiin-Mah, Warriyangka, Tharrkari, Jiwarli Indigenous Land Use Agreement (ILUA)15/06/2020 
Minnie Creek and Combined Thiin-Mah, Warriyangka, Tharrkari, Jiwarli Indigenous Land Use Agreement (ILUA)15/06/2020 
Kooline and Combined Thiin-Mah, Warriyangka, Tharrkari, Jiwarli Indigenous Land Use Agreement (ILUA)15/06/2020 
Edmund and Combined Thiin-Mah, Warriyangka, Tharrkari, Jiwarli ILUA15/06/2020 
Gkuthaarn and Kukatj People and Ergon Energy Indigenous Land Use Agreement (ILUA)5/06/2020 
Carpentaria Shire Council Gkuthaarn and Kukatj Indigenous Land Use Agreement (ILUA)2/06/2020 
Quandamooka Tenure Resolution Indigenous Land Use Agreement (ILUA)29/05/2020 
Canteen Creek Area Indigenous Land Use Agreement (ILUA) 20/05/2020 
Taungurung Settlement Indigenous Land Use Agreement (ILUA)30/04/2020 
Gurambilbarra Wulguruka People and J & MM Lowth Pty Ltd Indigenous Land Use Agreement (ILUA)23/03/2020 
Gunggari People #4 and Ergon Energy Indigenous Land Use Agreement (ILUA)13/03/2020 
Gunggari People #4 & Maranoa Regional Council Indigenous Land Use Agreement (ILUA)13/03/2020 
Isis Central Sugar Mill Rail Agreement Indigenous Land Use Agreement (ILUA)6/03/2020 
Buronga HealthOne Indigenous Land Use Agreement4/03/2020 
RTIO and Nyiyaparli People Indigenous Land Use Agreement (ILUA)27/02/2020 
Balanggarra #3 Indigenous Land Use Agreement14/02/2020 
Mithaka People Land Exchange Indigenous Land Use Agreement 24/12/2019 
Project Sea Dragon Indigenous Land Use Agreement (ILUA)19/12/2019 
Redford Station Indigenous Land Use Agreement (ILUA)10/12/2019 
Gunggari People/Hillside Indigenous Land Use Agreement (ILUA)10/12/2019 
FMG - Nyiyaparli Land Access Agreement Indigenous Land Use Agreement WI2019/00516/10/2019 
Copmanhurst Projects Indigenous Land Use Agreement (ILUA)4/10/2019 
Jubilee Quarry Indigenous Land Use Agreement (ILUA)1/10/2019 
Barkandji Single Dealings Indigenous Land Use Agreement (ILUA)10/09/2019 
Barkandji RNTBC Keltren Indigenous Land Use Agreement (ILUA)30/07/2019 
Jurruru #3 and Kooline Indigenous Land Use Agreement (ILUA)28/07/2019 
Dauan Island Department of Home Affairs Indigenous Land Use Agreement (ILUA) 16/07/2019 
Widi People and Local Government Indigenous Land Use Agreement (ILUA)4/07/2019 
Nyiyaparli and BHP Billiton Comprehensive Agreement Indigenous Land Use Agreement (ILUA)1/07/2019 
Shoalwater Bay Training Area Expansion Project Indigenous Land Use Agreement (ILUA) 17/06/2019 
Erub Landfill Indigenous Land Use Agreement (ILUA) 13/05/2019 
Erub Island Department of Home Affairs Indigenous Land Use Agreement (ILUA) 13/05/2019 
Aureed Island Department of Home Affairs Indigenous Land Use Agreement (ILUA) 7/05/2019 
Andamooka Pecious Stones Field Agreement Indigenous Land Use Agreement (ILUA)7/05/2019 
Poruma Island Department of Home Affairs Indigenous Land Use Agreement (ILUA)7/05/2019 
Mardigan People Claim Resolution Indigenous Land Use Agreement (ILUA)24/04/2019 
Dauan Health Care Indigenous Land Use Agreement (ILUA)6/03/2019 
Badu Infrastructure and Housing Indigenous Land Use Agreement (ILUA)26/02/2019 
Tablelands Regional Council Girramay People #2 Indigenous Land Use Agreement (ILUA)8/01/2019 
Westside Indigenous Land Use Agreement (ILUA)8/01/2019 
Bellary Springs Indigenous Land Use Agreement (ILUA)8/01/2019 
Girramay People Tenure Resolution Indigenous Land Use Agreement (ILUA) 8/01/2019 
Djiru Cassowary Coast Regional Council Dunk Island Recreational Reserve Indigenous Land Use Agreement (ILUA)14/12/2018 
Wakka Wakka People #3 and Gympie Regional Council Indigenous Land Use Agreement (ILUA)13/12/2018 
Sarum Project Indigenous Land Use Agreement (ILUA)11/12/2018 
Sand Quarry Indigenous Land Use Agreement (ILUA)11/12/2018 
Mer (Murray Island) Torres Strait Social Housing Indigenous Land Use Agreement (ILUA) #210/12/2018 
Nywaigi People Tenure Resolution Indigenous Land Use Agreement (ILUA)10/12/2018 
Kaurna People Native Title Settlement Indigenous Land Use Agreement (ILUA)19/11/2018 
Barngarla Determination Indigenous Land Use Agreement16/11/2018 
Alinta-Kariyarra Electricity Infrastructure Indigenous Land Use Agreement (ILUA)2/11/2018 
Ballardong People Land Use Agreement (ILUA)17/10/2018 
Whadjuk People Indigenous Land Use Agreement (ILUA)17/10/2018 
Wagyl Kaip & Southern Noongar Indigenous Land Use Agreement (ILUA)17/10/2018 
Yued Indigenous Land Use Agreement (ILUA)17/10/2018 
Gnaala Karla Booja Indigenous Land Use Agreement (ILUA)17/10/2018 
South West Boojarah #2 Indigenous Land Use Agreement (ILUA)17/10/2018 
Saibai Infrastructure and Housing Indigenous Land Use Agreement (ILUA)3/09/2018 
Mer Island Department of Home Affairs Lease Indigenous Land Use Agreement (ILUA)8/08/2018 
Gariwerd Non-Extinguishment Principle Indigenous Land Use Agreement (ILUA)20/06/2018 
Birriliburu Sandalwood Indigenous land Use Agreement (ILUA)18/06/2018 
Erub (Darnley Island) Torres Strait Social Housing Indigenous Land Use Agreement (ILUA) #229/05/2018 
Kariyarra and State Indigenous Land Use Agreement (ILUA)29/05/2018 
Kooline Pastoral Lease Land Addition Indigenous Land Use Agreement (ILUA)28/05/2018 
Tanami Gas Pipeline: Napperby Perpetual Pastoral Lease Indigenous Land Use Agreement (ILUA)17/05/2018 
Tanami Gas Pipeline: Narwietooma Indigenous Land Use Agreement (ILUA)16/05/2018 
Port Curtis Coral Coast Tenure Resolution Indigenous Land Use Agreement (ILUA)3/05/2018 
Budina and Lyndon Indigenous Land Use Agreement (ILUA)3/05/2018 
Budina and Towera Indigenous Land Use Agreement (ILUA)3/05/2018 
Budina and Middalya Indigenous Land Use Agreement (ILUA)3/05/2018 
Budina and Emu Creek Indigenous Land Use Agreement (ILUA)3/05/2018 
Barngarla and Lucky Bay Indigenous Land Use Agreement (ILUA)26/04/2018 
Doojum CLA NT Portion 4984 Indigenous Land Use Agreement (ILUA)24/04/2018 
FMG - Kariyarra Land Access Indigenous Land Use Agreement (ILUA)8/03/2018 
Wuthathi Land Transfer Indigenous Land Use Agreement (ILUA)7/03/2018 
Melsonby Indigenous Land Use Agreement (ILUA)21/02/2018 
Sandstone Western Land Transfer Indigenous Land Use Agreement (ILUA)21/02/2018 
Bromley Land Transfer Indigenous Land Use Agreement (ILUA)30/01/2018 
Red Gum Store Indigenous Land Use Agreement (ILUA)30/01/2018 
Topsy Creek Barge Ramp Project Indigenous Land Use Agreement (ILUA)22/01/2018 
Warraber (Sue Island) Torres Strait Social Housing Indigenous Land Use Agreement (ILUA)22/01/2018 
Saibai Island Torres Strait Social Housing Indigenous Land Use Agreement (ILUA)22/01/2018 
Iama (Yam Island) Torres Strait Social Housing Indigenous Land Use Agreement (ILUA)2/01/2018 
Ugar Community Hall Indigenous Land Use Agreement (ILUA)21/12/2017 
Wangan & Jagalingou People and Adani Mining Carmichael Project Indigenous Land Use Agreement (ILUA)8/12/2017 
Mabuiag Torres Strait Primary Health Care Centre and Staff Accommodation Indigenous Land Use Agreement (ILUA)20/11/2017 
Gumbaynggirr (Boney) Settlement Indigenous Land Use Agreement (ILUA)6/11/2017 
FMG - Palyku Land Access Indigenous Land Use Agreement (ILUA)3/11/2017 
Badu Island Supermarket and Cafe/Storage Indigenous Land Use Agreement (ILUA)20/10/2017 
Barkandji Appin Station Indigenous Land Use Agreement (ILUA) 14/08/2017 
Barkandji Weinteriga and Yobel Station Indigenous Land Use Agreement (ILUA) 14/08/2017 
Peninsula Development Road Indigenous Land Use Agreement (ILUA)11/07/2017 
BAC KSCS Indigenous Land Use Agreement (ILUA)19/05/2017 
Jemena Northern Gas Pipeline Project Indigenous Land Use Agreement (ILUA)16/05/2017 
Bunuba Conservation Parks Indigenous Land Use Agreement (ILUA)16/05/2017 
Kalkadoon and Jemena Northern Gas Pipeline Project Indigenous Land Use Agreement (ILUA)8/05/2017 
Ngarlawangga and Turee Creek Indigenous Land Use Agreement (ILUA)5/05/2017 
Ngarlawangga and Prairie Downs Indigenous Land Use Agreement (ILUA)5/05/2017 
Ngarlawangga and Bulloo Downs Indigenous Land Use Agreement (ILUA)5/05/2017 
Jinibara-Cedar Hill Plant Harvesting Indigenous Land Use Agreement (ILUA)20/04/2017 
Northern Gas Pipeline: CLC Tennant Indigenous Land Use Agreement (ILUA)7/04/2017 
Northern Gas Pipeline: Phillip Creek Indigenous Land Use Agreement (ILUA)7/04/2017 
Northern Gas Pipeline: CLC UCL Indigenous Land Use Agreement (ILUA)7/04/2017 
Bigambul People and Local Governments Indigenous Land Use Agreement (ILUA)24/03/2017 
Eromanga Township Tenure Resolution Indigenous Land Use Agreement (ILUA)22/03/2017 
NKAC KSCS Eighty Mile Beach Indigenous Land Use Agreement (ILUA)22/03/2017 
Waanyi - Burke Shire Council (Gregory Solar Farm Project) Indigenous Land Agreement (ILUA)12/03/2017 
Kenbi Indigenous Land Use Agreement2/02/2017 
Bollon Township Land Exchange Indigenous Land Use Agreement (ILUA)16/01/2017 
Irrwanyere Settlement Indigenous Land Use Agreement (ILUA)10/01/2017 
PKKP and Nanutarra Indigenous Land Use Agreement (ILUA)4/01/2017 
PKKP and Kooline Indigenous Land Use Agreement (ILUA) 4/01/2017 
PKKP and Cheela Plains Indigenous Land Use Agreement (ILUA)4/01/2017 
Investigator Road Mooring Buoy Removal Indigenous Land Use Agreement (ILUA)22/12/2016 
Indjalandji-Dhidhanu and Jemena Northern Gas Pipeline Project Indigenous Land Use Agreement (ILUA)21/12/2016 
Walka Wani Settlement Indigenous Land Use Agreement (ILUA)15/12/2016 
FMG-Nyiyaparli Land Access Indigenous Land Use Agreement (ILUA) WI2016/00315/12/2016 
Yawuru Nagulagun/Roebuck Bay Marine Park Indigenous Land Use Agreement (ILUA)13/12/2016 
Yirendali People Claim Resolution Indigenous Land Use Agreement (ILUA)2/12/2016 
Darumbal People Tenure Resolution Indigenous Land Use Agreement (ILUA)2/12/2016 
Barngarla/Central Eyre Iron Project Indigenous Land Use Agreement (ILUA) 1/12/2016 
Erub Island Multi Purpose Facility Indigenous Land Use Agreement (ILUA) 4/11/2016 
Banjima & RTIO Participation Agreement Indigenous Land Use Agreement (ILUA) (Body Corporate Agreement)1/11/2016 
Dinah Island Indigenous Land Use Agreement (ILUA)24/10/2016 
Birriah People Tenure Resolution Indigenous Land Use Agreements (ILUA)27/09/2016 
Birriah People/Spurdle Family Indigenous Land Use Agreement (ILUA)27/09/2016 
Sandstone East Land Transfer Indigenous Land Use Agreement (ILUA)23/09/2016 
Yungngora Aboriginal Corporation RNTBC, Buru Energy Limited and Diamond Resources (Canning) Pty Ltd Indigenous Land Use Agreement (ILUA)5/09/2016 
Barada Barna People/Killarney Indigenous Land Use Agreement (ILUA)31/08/2016 
Barada Barna People and Local Government Indigenous Land Use Agreement (ILUA)29/08/2016 
Gunaikurnai Land and Waters Aboriginal Corporation, Peter D Howson and Thomas A Howson and State of Victoria Indigenous Land Use Agreement (ILUA)12/08/2016 
Rainbow Beach Ambulance Station Indigenous Land Use Agreement (ILUA)29/07/2016 
Yinhawangka and BHP Billiton Project Agreement Initial Indigenous Land Use Agreement (ILUA)29/07/2016 
Dieri Geotechnics Indigenous Land Use Agreement (ILUA)29/06/2016 
Moranbah Indigenous Land Use Agreement (ILUA)18/05/2016 
Kwokkunum Access Indigenous Land Use Agreement (ILUA)23/03/2016 
Ewamian People - Forsayth Wind Farm Indigenous Land Use Agreement (ILUA) 30/05/2013  
Oyala Thumotang National Park (Cape York Peninsula Aboriginal Land) and adjacent Aboriginal Land Indigenous Land Use Agreement (ILUA) 13/12/2012
Ergon Energy and Tableland Yidinji People Indigneous Land Use Agreement (ILUA)13/12/2012
Batavia Indigenous Land Use Agreement (ILUA) 20/11/2012
RTIO and PKKP People Indigenous Land Use Agreement (ILUA) 15/11/2012
SCONI Project Indigenous Land Use Agreement (ILUA)20/08/2012
Ergon Energy and Ankamuthi People Indigenous Land Use Agreement (ILUA)3/11/2011 
Iron Range, Portland Roads and Islands Indigenous Land Use Agreement (ILUA)28/07/2011 
Browse LNG Precinct Project Agreement30/06/2011
Murchison Radio-astronomy Observatory Agreement 13/11/2009  
Wik & Wik Way People and Cook Shire Council Agreement # 2 5/11/2009 
Ewamian / Sporting Shooters Association of Australia Forsayth and District Branch Incorporated IA19452 1/04/2009 
Mining Agreement Between Thor Mining and Eastern Arrernte Native Title Holders25/10/2007
Gournditch-Mara & Lynch Mining - Victorian Exploration Licences 4368 & 4369 6/10/2006 
Native Title Agreement between the Wajarri and Ngoonooru Wadjari Peoples and Murchison Metals31/08/2005
South-West Queensland Cooper Basin Exploration Agreement (Native Title Act) June 20051/06/2005
Cooper Basin Oil and Gas Exploration Agreement1/01/2005
Native Title Petroleum Agreement between the Northern Land Council and Pardi Pty Ltd1/01/2003
Native Title Petroleum Agreement between the Northern Land Council and Sweetpea Corporation1/01/2003
Burrup and Maitland Industrial Estates Agreement Implementation Deed1/01/2003 
MaMu Canopy Walk Heads of Agreement24/03/2002 
Cooper Basin Access Agreements1/10/2001
Model Exploration & Mining Agreement between Rio Tinto Exploration Pty Ltd, Local Aboriginal Groups and the Northern Land Council1/01/2001
Eastern Guruma Agreement1/01/2001
Coal and Allied Cultural Heritage Management Agreement1/01/2001
Guruma Memorandum of Understanding1/01/2000
Western Mining Corporation (WMC) Olympic Dam Agreements1/03/1999
Coal and Allied Memorandum of Understanding1/01/1999
Comalco Protocol1/01/1999
Mount Hotham Airport Agreement12/10/1998
Land Tenure Agreement between the State of Queensland, the Western Yalanji People, and Alan and Karen Pedersen28/09/1998
Land Use and Access Agreement between Western Yalanji, State of Queensland and Noel A. Adam28/09/1998
Hutt Lagoon Aquaculture Project Agreement28/08/1998
Merlin Diamond Mine Northern Territory and the Wurdaliya and Wuyaliya Peoples Agreement16/06/1998
Kistler Satellite Launch Project Agreement1/06/1998
Lambina Opal Mining Field Agreement1/06/1998
AuDAX Resources NL and the Mirriwung Gajerrong People Agreement1/05/1998
Pilbara Energy Pty Ltd (BHP) Gas Pipeline Extension Agreement12/03/1998
North East Goldfields (Interim) Heritage Site Clearance Protocol8/02/1998
Hail Creek Protocol1/01/1998
Hail Creek Coal Agreement Wiri Yuwiburra1/01/1998
Australian Gas Light Company Agreement10/12/1997
Union Mining, the Ewamian People and the State of Queensland Agreement1/11/1997
Alcan South Pacific Agreement3/09/1997
Gulf Communities Agreement1/09/1997
Eastern Gas Pipeline Agreement27/08/1997
Striker Resources and the Balangarra People Accord20/08/1997
South Australian Access Clearance Agreement15/08/1997
Manna Hill Mining Company and the Kuyani/Adnyamathanha Peoples Agreement1/08/1997
Bundjalung People and Ross Mining Agreement25/07/1997
Murrin Murrin Project Agreement3/04/1997
Midwest Gas Pipeline Agreement1/01/1997
Yandicoogina Negotiations Protocol & Confidentiality Deed1/01/1996
Woodcutters Mine Agreement1/01/1995
Skardon River Kaolin Project1/01/1994
The Mount Todd Deed of Agreement28/01/1993
Woodcutters Heads of Agreement1/11/1991
Kintyre Draft Agreement
Pro forma section 31 Deed for Exploration Licences (Victoria)
BHP Area C Agreement
Pro forma Section 31 Deed for Mining Licences (Victoria)
Darumbal People, Livingstone Shire Council and Rockhampton Regional Council Local Government Indigenous Land Use Agreement (ILUA) 
Gudjala People and State of Queensland and Dianne Rose Patterson Indigenous Land Use Agreement 
Ugar Infrastuctures and Housing Indigenous Land Use Agreement (ILUA) 
Tangalooma Indigenous Land Use Agreement 
Yuwibara People Interim Indigenous Land Use Agreement (ILUA) 
The Rocks Quarry Indigenous Land Use Agreement  
Girramay People #2 and Cassowary Coast Regional Council Indigenous Land Use Agreement (ILUA) 
Kintyre Aboriginal Survey and Compensation Agreement
Model Low Impact Exploration Access Agreement
Pro forma Project Consent Deed for Petroleum Exploration Permits (Victoria)
Pro forma section 31 Deed for Petroleum Exploration Permits (Victoria)
Access Clearance and Native Title Mining Agreement
Pro forma Project Consent Deed for Petroleum Production Licences (Victoria)
Pro forma Project Consent Deed for Mining Licences (Victoria)
Pro forma Project Consent Deed for Exploration Licences (Victoria)
Work Area Clearance Agreement
Sand Mining Agreement
Pastoral Lease Grant Agreement
Mining Agreement
Future Act - Mining Agreement
Exploration Agreement
Pro forma section 31 Deed for Petroleum Production Licences (Victoria)

Was this useful? Click here to fill in the ATNS survey